Monday, May 14, 2012

Crib









Stripped and gutted . Putting it back together its always more to do than you think ( if you do it right) . New roof  (murrow roofing  ), smashed old tub ,cut out the bathroom and the kitchen floor beefed up  floor joist,  put sub floor back. Cut out all plumbing installed all new water pipe, drain waste and vent pipe. new cast iron tub.New  Electric  (safety electric inc ) .  Soon to come kitchen cabinets, sheet rock, tile(bathroom) ,hardwood floor (kitchen). Lisa and I have  been pulling long days and nights and weekends. starting to see the light at the end of the tunnel. post more as the progress continues.

1 comment:

  1. Oh hell. Hurricane Daniel hitting that poor old house, category 5 style.

    ReplyDelete

So, ya got something to say, huh?