Friday, February 11, 2011

Long time coming

Borrowed a garage for a couple weeks. Moto-entropy has been catching up with me so I am holed up in a condemned garage with little light and surprisingly little room because every few feet there's a ceiling leak from the pools of rainwater that have collected on the roof and are seeping in. It's a lot of water. Two of the ceiling rafters have buckled under the weight and are being held up with makeshift stilts … and to think of all those suburban garages crammed full of canned foods from Costco, Christmas decorations, and bikes that never see the light of day. There's no justice in this world.

From the top: carb cleaning and syncing, new steering stem bearings, new plugs, oil filter and change, new choke cable, new clutch cable, brake overhaul, dashboard lights, radiator flush, and finally: new-old fairings. Got a short list of other things I'd like to get done but it'll have to wait. Need to get the bike back to life for a trip in a few weeks.

Here's a few pics of the process.












1 comment:

  1. Christ the hipstamatic is the ultimate innovation of our lifetimes. Amazing. I love these pictures.

    ReplyDelete

So, ya got something to say, huh?